Search for SP213
Brake pads
381-0490-N-193483
code: 381-0490-N-193483
quality :PJ
PJ - technology and materials, used in the production process, are compatible with OE technology, or better. Thermal efficiency NOT lower than OE/OEM or OES product.
Part name: Brake pads
Part Kind: Disc brakes
Part group: Braking systems
Application period: -12.06
Location: front
Location: front
Make: Daewoo
Model: MATIZ (M200, M250), 03.05-
Sales unit: packing unit: 1 kpl.
Engine code: LQ4(61CUL4)
Displacement (rounded) [cc]: 995
Drive Type: Front Wheel Drive
Fitting Position: Front Axle
From construction year: 01.08
Output to [HP]: 67
Output to [kW]: 49
To construction year: 12.06
To construction year: 08.14
OE: FD6818E
OE: FD6818
OE: 96273708
OE: 96446176
Coil spring
407-559C-N-194970
code: 407-559C-N-194970
quality :PJ
PJ - technology and materials, used in the production process, are compatible with OE technology, or better. Thermal efficiency NOT lower than OE/OEM or OES product.
Part Kind: Coil spring
Part group: Coil springs
Part name: Coil spring
Manufacturer: TEVEMA
Location: Front
Make: Cadillac
Model: BLS, 04.06-
Sales unit: 1 pcs.
Engine code: B207R; LK9(122CUL4)
Displacement (rounded) [cc]: 1998
Fitting Side: Front Axle
From construction year: 04.06
Output to [HP]: 210
Spring Design: coil spring
Supplementary Article/Supplementary Info: R
OE: 12786059
OE: 93190594
OE: 12756517
Brake pads
381-0496-N-333212
code: 381-0496-N-333212
quality :Q
Q - genuine component OE/OEM or OES, marked with logo-trademark of the manufacturer of the component that supplies given component for the assembly of vehicles.
Part name: Brake pads
Part Kind: Disc brakes
Part group: Braking systems
Application period: 08.98-08.02
Make: Daewoo
Model: MATIZ box / liftback (KLA4), 08.98-08.02
Sales unit: packing unit: 1 kpl.
Engine code: F8CV
Displacement (rounded) [cc]: 796
From construction year: 08.98
Output to [HP]: 52
Output to [kW]: 38
To construction year: 08.02
OE: 96446176
OE: 96281945
OE: 58296316
OE: 70896273
*Lowest price for the last 30 days with VAT